Top sale heavy duty double girder overhead bridge crane 25 ton with electric trolley

25 Ton Overhead Crane | Double Girder EOT Crane | Good ...

b'25 ton overhead crane is a kind of heavy-duty hoisting machine. It mainly consists of the bridge, lifting mechanism, traveling mechanism, electrical system, and trolley, etc. With strong lifting capacity, high efficiency, and stable performance, 25 ton bridge crane is \xe2\x80\xa6'

Double Girder Top Running Overhead Cranes | EMH, Inc.

b'This 200/50 ton radio-controlled crane loads turbines onto rail cars for shipment. Crane has a span of 75 feet, a lift of 40 feet, and uses two EMH engineered hoists. Two 35-ton, 80 foot double girder cranes are used for precise placement of large equipment at this'

Overhead Crane for sale | eBay

b'P&H 50 TON 20 TON TOP RUNNING DOUBLE GIRDER OVERHEAD BRIDGE CRANE. $135,000.00. or Best Offer. Shaw-Box 10 Ton Hoist. 35 Foot I-Beam. No End Trucks Included Overhead Crane. $10,000.00. \xe2\x80\xa6'

25 ton Double girder overhead crane price - Buy 25 ton ...

b'1.It is a heavy duty type overhead crane that satisfy frequently using, and Suitable for any environment ( High Temperature, Explosion Proof and so on); 2.It has features of Heavy duty, high efficiency, Long life span, easy for Installation and maintenance. 3.Depending on lifting cargo, crane can be equipped with ...'

Double Girder Gantry Crane - High Quality Gnatry Crane for ...

b'Excellent double girder gantry cranes. Usually, the double girder gantry crane is designed to move, lift or transport heavy materials that reach 200 ton or ever more. Compared with the single girder gantry crane,'

Overhead Bridge Cranes -Industrial -Ace World Companies

b'Double Girder Overhead Cranes: Double girder top running cranes \xe2\x80\x93 This type of overhead crane can be used in heavy-duty situations so your load can range from 5-500 tons. The span of this overhead crane'

What is the Cost of an Overhead Crane System?

b'Aug 16, 2017 \xc2\xb7 The complexity of the overhead crane components required to operate the crane, the engineering required to design the crane, and the application (industry or materials being lifted) will determine what type of crane you will need. For example, an 80 foot, 20-ton double girder bridge crane'

Hoosier Crane | Overhead Cranes - New Equipment

b'Understanding the Overhead Bridge Crane. Moving tonnage requires heavy-duty tools to ensure that the job is done safely and efficiently. The bridge crane, consisting of two overhead beams, or runways, that ,'